![]()
| Project Name: | Off System Ramp Improvements |
| Location: | City of Gainesville, Texas |
| Paragon's Role: | As a Design Consultant, Paragon was responsible for the civil engineering associated with the re-design of the ramp system from SH 82 to The Red River, approximately 5 miles in length. |
| Owner/Client: | TxDOT |
| Project Duration: | ___________ |
| Constructed Value: | ___________ |
|
« Back |